Our Gallery

Replacement of 1500 mm dia 1000 mm dia in left out portion from Haiderpur WTP to Deer Park & Palam Reservoir.

Replacement of 1500 mm dia South Delhi Main & 1000 mm dia Palam Main in left out portion from Haiderpur Water Treatment Plant to Deer Park & Palam Reservoir.

Haiderpur DJB New Delhi

2018-12-10

Main for the corridor / influence zone.

Shifting of Water and Effluent Main from Pragati Maidan Gate No.7 to 3, DPS and Sundar Nagar at Mathura road and Gas Turbine Power Station to MCD Nallah, Ring road for construction of Integrated Transit corridor development and street Network / connectivity Plan for the corridor / influence zone.

Ashok Vihar DJB New Delhi

DI pipes of size 350mm to 700mm

“Providing, stringing out, jointing, cutting and testing of DI pipes of size 350mm to 700mm i/d MS pipe line 1200mm and 1500 i/d, providing & fixing sluice valves, air valve and construction of sluice valves haudies for Zone-IV & V (Partial), Gurugram and all other works contingent thereto.” (Including maintenance for 3 years and including defect liability period free of cost).

Gurugram GMDA Haryana

Construction of 2.70 MG (12.4 ML) capacity UGR/BPS at Siraspur.

Construction of 2.70 MG (12.4 ML) capacity UGR/BPS at Siraspur.

Siraspur DJB New Delhi

2018-02-07

Balance Water Distribution Network of the North Zone Guwahati.

Procurement of Works (Item rate) for Supply and Installation of Pipe and Fittings and Installation of the Employer furnished D.I Pipes for the balance Water Distribution Network of the North Zone.

Guwahati JICA Assam

2016-07-23

Replacement of 1000mm dia PSC Water main from Prasant Vihar to Peera Garhi.

Replacement of 1000mm dia PSC Mangol Puri water main from Prasant Vihar Red light to Peera Garhi UGR.

Peera Garhi DJB New Delhi

2016-05-09

Replacement of left out portions of Pitampura and North-West main

Replacement of left out portions of Pitampura and North-West main from Haiderpur WTP-I to MU Block Pitampura UGR and OHT Pushpanjali Enclave.

Pitampura DJB New Delhi

Water Supply Project in Mehuwala Cluster Uttarakhand

Development of Water Supply Project in Mehuwala Cluster, Uttarakhand in Dehradun District on Design, Build and Operate Framework.

Mehuwala UPJN Uttarkhand

Replacement of 1500 mm dia old PSC West Delhi water main emanating from Haiderpur WW-II with MS lined and coated pipe.

Replacement of 1500 mm dia old PSC West Delhi water main emanating from Haiderpur WW-II with MS lined and coated pipe.

Haiderpur DJB Nw Delhi

2017-08-29

agar including 5 year O&M after one year DLP.

Supply, Laying, Testing and Commissioning of Rising main of capacity 10 MGD and other contingent works including all piping, electrical, mechanical & instrumentation works from WTP village Sinhpur to various water works/UGRs located at various locations in New Chandigarh, Mullanpur, SAS Nagar including 5 year O&M after one year DLP.

Mohali GMADA Punjab

2014-08-14

Installation of Tube Wells at Bhagirathi WTP and other suitable locations for augmentation of water supply.

Installation of Tube Wells at Bhagirathi WTP and other suitable locations for augmentation of water supply.

Bhagirathi DJB New Delhi

2014-05-02

P/L 800 mm dia rising main and sump well for carriage of treated effluent from STP Kondli to Smirti van/lake

P/L 800 mm dia rising main including construction of sump well for carriage of treated effluent from STP Kondli to Smirti van/lake and for nearby DDA and MCD Parks.

Karkardooma DJB New Delhi

2013-03-11

Execution of work of Pokaran Falsoond Balotra Siwana Water Supply Project Part-4A Cluster Distribution, internal village pipe distribution and Geo-Tagging along with construction of CWR and Pumping Stations and providing FHTCs in 180 villages of District Barmer etc. complete job including one year defect liability Period followed by Operation and Maintenance for 10 years of facilities executed up to Village Transfer Chambers under Jal Jeevan Mission.

Jodhpur PHED Rajasthan

2012-03-15

scheme (distribution mains) for Zone-III, U,E Gurgaon.

Providing, stringing out. Jointing cutting and testing of 1600mm i/d M.S pipe and stringing out jointing, cutting and testing of D.I pipes of 300mm to 1200mm i/d providing and fixing of sluice valves, construction of sluice valve haudies and all other works contingent thereto including A/Mtc for 3 years.

Gurugram HUDA Haryana

Providing Infrastructure facilities (PHE works) on turnkey basis i.e. Water supply & waste water collection & its disposal, Storm Water Drainage & its disposal, recirculation of treated waste water with pumping station & horticulture and all other works contingent thereto including operation and maintenance of services provided during trial run of 3 months after completion and maintenance during defect liability period of 12 months thereafter in Phase IV at Industrial Model Township, Bawal (Rewari).

Rewari HSIIDC Haryana

Water Supply Distribution Network for core areas (Balance Works). Dehradun

Supplying, Laying, Jointing, Testing and Commissioning of Water Supply Distribution Network for core areas (Balance Works).

Dehradun UUSDIP Uttarkhand

20 MGD Water Supply Scheme

Commissioning of 20 MGD Water Supply Scheme, Consisting of Main Boosting Station (MBS), Providing & Stringing of DI Rising Mains from Kaboolpur-Khadar MBS to Sectors 75-89, Faridabad on EPC Basis, including purchase of land by contractor for MBS near village Kaboolpur-Khadar, Faridabad (With Operation and Maintenance for 5 years including defect liability period of 1 year and all other works contingent thereto)

Faridabad HUDA Haryana

Providing/Laying of DI K-7, DI K-9 Water Supply lines, Deep Tubewells in various Wards. (Group-4)”

Providing/Laying of DI K-7, DI K-9 Water Supply lines, Providing/Inst. Of Deep Tubewells, Providing/Laying of rising mains etc. in various Wards. (Group-4)”

Ludhiana MCL Punjab

Providing/Laying of DI K-7, DI K-9 Water Supply lines, Deep Tubewells in various Wards. (Group-1)

Providing/Laying of DI K-7, DI K-9 Water Supply lines, Providing/Inst. Of Deep Tubewells, Providing/Laying of rising mains etc. in various Wards. (Group-1)”

Ludhiana MCL Punjab

2008-08-14

Providing master water supply scheme (distribution mains) for new sectors-58 to 115, (for Zone-IV to VIII)

Providing, stringing out, jointing, cutting and testing of 1600mm i/d & 1500 mm i/d M.S. pipe, providing and fixing of sluice valves, construction of sluice valve haudies and all other works contingent thereto." (including A/Mtc. for 3 years).

Gurugram HUDA Haryana

(Distribution mains) for (Zone-IV to VIII), Gurgaon.

Providing, stringing out, jointing, cutting and testing of DI pipes (K9) of 200mm to 1200mm i/d sizes and 1200mm MS pipe, providing and fixing of sluice valves, zero velocity valve, scour valve, double action air valve and construction of sluice valve haudies and all other works contingent thereto.”

Gurugram HUDA Haryana

Construction of Water Supply Transmission Main Pipelines and Allied Works in Guwahati.

Construction of Water Supply Transmission Main Pipelines and Allied Works in Guwahati.

Guwahati AUIIP Assam

700-1100 mm dia peripheral Sewer line in samaipur group of colonies DJB New Delhi

Providing and Laying 280mm to 1100 mm dia internal and peripheral sewer line in Samaipur group of colonies falling under Coronation Pillar WWTPS catchment areas in Delhi

Under Execution, Coronation Pillar, DJB New Delhi

2014-08-07

800 mm dia Trunck Sewer line in Nainital, Uttarakhand

Development of Sewerage System involving STP, Trunck Sewer and Allied works including 5 years Operation and Maintenance, at Nainital in Uttarakhand.

Under Execution Nainital Uttarakhand

700 to 1100 mm dia Trunk Sewer Line Nangloi-Najafgarh Road, Nilothi DJB New Delhi

Providing and Laying trunk sewer line 700mm to 1100mm RCC pipe on Nangloi-Najafgarh Road Falling under Nilothi WWTP Catchment area in Delhi

Sewage / Drainage Nilothi New Delhi

1600 mm dia Trunk Sewer Line Sector 2,3,5 and 6 Dwarka

Providing loop Trunk sewer line of 1600 mm dia by micro tunneling method due to settlement at Xing of Sector-2,3,5 and 6 Dwarka

Dwarka DJB New Delhi

2014-05-19

2000 mm dia Peripheral Sewer Line in Mitraon Goc

Providing, Laying, Jointing Internal and Peripheral Sewer LIne in Mitraon Goc and Part of Dichaon Goc under the Command of Mitraon STP

Najafgarh DJB New Delhi

1800 mm dia interceptor Sewer from Barapullah drain to Batla house SPS

Construction of interceptor sewer from Barapullah drain to Batla house SPS and construction of 35 MGD SPS at Batla House including its rising main up to Okhla WWTP” on Desin-Build & Operate Basis.

Okhla DJB New Delhi

Construction of 15 MGD Effluent Pumping Station at Pappankalan Dwarka

Construction of 15 MGD Effluent Pumping Station for water body / lake at Pappankalan Dwarka

Under Execution Dwarka DJB New Delhi

2014-08-07

Construction of 3.85 (MGD) WWPS Including Rising main at Yamuna Vihar

Construction of 3.85 (MGD) WWPS Including Rising main at Yamuna Vihar

Under Execution Yamuna Vihar DJB New Delhi

2014-05-19

P/ L / J internal and Peripheral Sewer line in Kair GOC under the Command of Kair STP

Providing / Laying/ jointing internal and Peripheral Sewer line in kair GOC under the Command of Kair STP

Under Execution Najafgrah DJB New Delhi

2012-08-01

Providing/ laying sewerage facilities in Mahipalpur, Rangpuri, Samalkhan, Rajokri & Kapashera villages.

Providing/ laying sewerage facilities in Mahipalpur, Rangpuri, Samalkhan, Rajokri & Kapashera villages.

Satisfactorily completed Lajpat Nagar DJB New Delhi

P/L/J Internal sewerage system in rural villages Khera, Papravat, Roshanpura & Deendarpur in Najafgarh area.

P/L/J Internal sewerage system in rural villages Khera, Papravat, Roshanpura & Deendarpur along with peripheral sewer by trench -less method in Najafgarh area.

Satisfactorily completed Najafgarh DJB New Delhi

2009-03-16

Const. of sewer network for Trunk Main sewer under Nilothi sewer

Const. of sewer network for Trunk Main sewer under Nilothi sewer

Satisfactorily completed Nilothi DJB New Delhi

Construction of Storm Water Drains in Sonepat Town.

Construction of Storm Water Drains in Sonepat Town.

Satisfactorily completed Sonepat Haryana

Providing and laying Trunk Sewer line in colonies of the Constituency

Providing and laying Trunk Sewer line in colonies of the Constituency: Part of Gokulpur and Part of Karawal Nagar falling under Yamuna Vihar WWTP Catchment area through Trenchless Technology in Delhi.

Satisfactorily completed Yamuna Vihar DJB New Delhi

2009-03-16

P / L / sewer line in Dharampura Group of colonies in Dharampura Extn. Roshan Garden etc. in Najafgarh Constituency.

Providing laying sewer line in Dharampura Group of colonies in Dharampura Extn. Roshan Garden etc. in Najafgarh Constituency.

Satisfactorily completed Najafgarh DJB New Delhi

2022-03-16

P/L sewer line in Sainik Nagar Group of Colonies in Matiyala Constituency.

P/L sewer line in Sainik Nagar Group of Colonies in Matiyala Constituency.

Satisfactorily completed Najafgarh DJB New Delhi

2009-03-22

Construction of Storm Water Drainage System in Thanesar (Distt. Kurukshetra) under AMRUT Program”.

Construction of Storm Water Drainage System in Thanesar (Distt. Kurukshetra) under AMRUT Program”.

Satisfactorily completed Kurukshetra Haryana

2018-06-25

1200 mm dia Rising Main Bharat Nagar DJB New Delhi

Providing & Laying 1200 mm dia DI Rising/ Pressure main form Bharat Nagar Wasteater Pumping Station at Pitampura

Under Execution, DJB New Delhi

2018-02-07

700-1100 mm dia peripheral Sewer line in samaipur group of colonies DJB New Delhi

Providing and Laying 280mm to 1100 mm dia internal and peripheral sewer line in Samaipur group of colonies falling under Coronation Pillar WWTPS catchment areas in Delhi

Under Execution, Coronation Pillar, DJB New Delhi

2017-10-11

900 - 1400 mm Water line Karawal Nagar, DJB New Delhi

Providing and laying Peripheral Water line Network for Karawal Nagar AC and Mustafabad AC in the Command area of Sonia Vihar

Under Execution Sonia Vihar DJB New Delhi

2014-08-07

800 mm dia Trunck Sewer line in Nainital, Uttarakhand

Development of Sewerage System involving STP, Trunck Sewer and Allied works including 5 years Operation and Maintenance, at Nainital in Uttarakhand.

Under Execution Nainital Uttarakhand

2014-05-19

700 to 1100 mm dia Trunk Sewer Line Nangloi-Najafgarh Road, Nilothi DJB New Delhi

Providing and Laying trunk sewer line 700mm to 1100mm RCC pipe on Nangloi-Najafgarh Road Falling under Nilothi WWTP Catchment area in Delhi

Sewage / Drainage Nilothi New Delhi

1600 mm dia Trunk Sewer Line Sector 2,3,5 and 6 Dwarka

Providing loop Trunk sewer line of 1600 mm dia by micro tunneling method due to settlement at Xing of Sector-2,3,5 and 6 Dwarka

Dwarka DJB New Delhi

2014-05-19

1200 mm dia pipeline Line River Crossing under Barauni Guwahati pipeline Project

Microtunneling and Pipeline installation works under Barauni Guwahati Pipeline Project.

Sankosh River Gail West Bengal

2014-05-19

2000 mm dia Peripheral Sewer Line in Mitraon Goc

Providing, Laying, Jointing Internal and Peripheral Sewer LIne in Mitraon Goc and Part of Dichaon Goc under the Command of Mitraon STP

Najafgarh DJB New Delhi

2014-05-19

1800 mm dia interceptor Sewer from Barapullah drain to Batla house SPS

Construction of interceptor sewer from Barapullah drain to Batla house SPS and construction of 35 MGD SPS at Batla House including its rising main up to Okhla WWTP” on Desin-Build & Operate Basis.

Okhla DJB New Delhi

2013-11-20

Creation of New Water Body at Sector-25, Rohini

Creation of New Water Body at Sector-25, Rohini STP

Rohini Sector - 25 DJB New Delhi